Sanitary, storm, and water service laid in open trench, on grade, on bedding — inspected before a yard of backfill covers it. The building will stand on this work for fifty years.
Every stub-up placed, braced, and protected before the concrete goes down. When the slab cures, the plumbing is exactly where the drawings said it would be.
Drains, vents, and copper water lines rise through the framing and close in behind finished walls. Pressure-tested and signed off before drywall ever hangs.
Commercial and industrial plumbing for general contractors who need every phase inspected, on schedule, and documented. From first trench to final fixture.